Your permit path depends on one thing first: whether your lot is inside Bend city limits or in unincorporated Deschutes County. Both follow the same statewide residential building code, and since spring 2026 both require fire-hardened construction for new homes. The real differences come before the building permit. A lot inside the city is mostly about utilities, drainage, and system development charges. A rural lot is mostly about land use, a legal lot of record, septic approval, and driveway access. Here’s how each path works, and what trips people up.
Step one: confirm who has jurisdiction
Being near Bend, or even inside Bend’s urban growth boundary, isn’t the same as being inside Bend city limits. Look the parcel up in Deschutes County’s DIAL property tool to confirm its jurisdiction and zoning before you plan anything else. Sisters, Redmond, and La Pine each run their own planning review, and the county’s dwelling permit research checklist tells owners building inside Sisters or La Pine city limits to contact those planning departments directly.
What’s the same everywhere
A few things don’t change with jurisdiction:
-
The building code. New homes across Oregon are built to the Oregon Residential Specialty Code, administered statewide by the Oregon Building Codes Division.
-
A licensed contractor. Anyone building a home for someone else in Oregon needs an active license with the Oregon Construction Contractors Board. Select’s is OR CCB# 234456.
-
Plan review, then inspections. Every new home goes through plan review before a permit is issued, then inspections at each construction stage.
-
Fire hardening for new homes. Covered in its own section below, because it changed this year.
Building inside Bend city limits
Inside the city, the City of Bend Building Safety Division manages building permits, and applications are reviewed jointly by the city’s Building Safety, Planning, and Private Development Engineering divisions. Applications go through the city’s Online Permit Center Portal.
What a city submittal usually involves:
-
The residential submittal checklist. The city’s property owners permitting guide points applicants to its residential submittal checklist and residential system development charges before applying.
-
System development charges (SDCs). One-time fees new homes pay toward city infrastructure. They’re a real line item in a city budget, and rural county lots don’t carry the same city charges.
-
Stormwater and site drainage. The city publishes a residential stormwater drainage plan template, so plan for how the lot will handle runoff.
-
Utility connections. Most city lots connect to sewer. Water may come from the City of Bend or from a private provider such as Avion or Roats, depending on the neighborhood. If sewer isn’t available to a city lot, the county handles the septic side, but only after the city signs an authorization form confirming sewer isn’t physically or legally available.
On timing, the city is candid: it doesn’t guarantee permit review times, but its developers and contractors guide links a Permit Turnaround Time Dashboard showing average review times by permit type. Check it when you’re planning, because averages move with workload.
Building in unincorporated Deschutes County
Outside city limits, Deschutes County Community Development handles land use, septic, and building permits. The county’s own checklist lists what has to be in place before you apply for the building permit:
-
Land use requirements met through Planning, if applicable. Whether a new home needs a planning (zoning) permit depends on the zone. The county’s what permits do I need guide walks through this.
-
An approved septic system, or approval to install one, if the lot isn’t on sewer. That starts with a site evaluation. Our guide to septic and well basics for rural Deschutes County covers the process.
-
Driveway access, which can require its own permit.
-
An Oregon ePermitting account with the right licenses associated, since county building permits are applied for through Oregon ePermitting.
Two county-specific items catch people off guard:
-
Legal lot of record. Rural owners must confirm the parcel is a legal lot of record before the county will issue land use, building, or septic permits. If the county has already issued a permit on the parcel, you usually don’t need to verify it again.
-
Combining zones. Some parcels carry an overlay zone on top of the base zoning. The most common one for homebuilders is the Landscape Management (LM) combining zone, which applies along designated rivers and scenic roads. Any new structure needing a building permit in an LM zone must get site plan approval first, including a landscape plan showing existing trees and vegetation between the home and the designated river or road. For some parcels next to the Deschutes River and other named rivers, a conservation easement is a condition of approval. Check DIAL for any combining zone before you design.
Bend vs. Deschutes County Building Permit Requirements

The 2026 change: fire-hardening code for new homes
In 2025, Oregon repealed its statewide wildfire hazard map and the building requirements tied to it, leaving fire-hardening code to local building departments. Central Oregon’s moved quickly:
-
Unincorporated Deschutes County and Sisters: Section R327 fire hardening became mandatory for all new dwellings and new accessory structures beginning April 1, 2026.
-
City of Bend: the City Council adopted R327 for new residential building permit applications submitted on or after May 15, 2026.
R327 calls for noncombustible or ignition-resistant materials on exterior components such as roofing, gutters, windows, vents, and siding. It applies to new construction, not additions or renovations of existing homes. Bend’s Building Safety Division also accepts products from the CalFire building materials listing as part of an R327-compliant design, and it publishes a residential wildfire hazard mitigation checklist. The Oregon Building Codes Division keeps a list of jurisdictions that have adopted the code.
What it means for your project: fire hardening shapes material choices from the first design meeting, not at the end. Exterior finishes, window specs, vents, and decking all need to be selected with R327 in mind, and the permit set has to show it. As the county puts it, fire hardening doesn’t make a home fireproof. It makes the home more resistant to embers, heat, and flame.
Why permits take longer than expected
We don’t publish permit durations, because review times depend on the jurisdiction’s current workload and on which reviews your lot triggers. What reliably slows things down:
-
Incomplete submittals. Missing drawings, forms, or calculations send a plan set back for corrections.
-
Septic not approved yet on a rural lot. The county won’t issue a building permit without it.
-
An unverified lot of record on a rural parcel.
-
A combining zone found late, such as an LM site plan review nobody planned for.
-
Material specs that don’t show R327 compliance on a 2026 permit set.
-
Design review in a planned or resort community, which often runs before or alongside the permit.
The fix for most of these is the same: research the parcel first, then design, then submit a complete set.
What to do next
-
Confirm jurisdiction, zoning, and any combining zones in DIAL.
-
On a rural lot, start the septic site evaluation and confirm lot of record status early.
-
On a city lot, review the residential submittal checklist and the SDC schedule, and confirm your water provider.
-
Plan exterior materials around R327 from the start.
-
If your lot is in a planned community, get the design guidelines before design begins. If you’re building in Caldera Springs, see our Caldera Springs homesites and plans.
Still evaluating land? Start with our building lot checklist for Central Oregon.
How Select handles permitting
When we build on your land, site preparation, permitting, and approvals are part of the project from the start, handled by the same team that designs and builds the home. During plan design, we fit your plan to the lot’s setbacks, septic layout, and the fire-hardening requirements, whether you start from one of our proven floor plans or design fully custom. You can see where permitting fits in the full sequence on our process page.
Have a lot, or one under contract? Request a complimentary design consultation or call 541.527.7462.
Frequently asked questions
Do I get my building permit from the City of Bend or Deschutes County? It depends on whether the parcel is inside Bend city limits. City lots go through the City of Bend; unincorporated lots go through Deschutes County. Sisters, Redmond, and La Pine have their own planning departments. Check the parcel in DIAL.
Do new homes in Bend have to meet wildfire building code? Yes. The City of Bend adopted Section R327 of the Oregon Residential Specialty Code for new residential permit applications submitted on or after May 15, 2026. Unincorporated Deschutes County and Sisters have required it for new dwellings since April 1, 2026.
What do I need before applying for a building permit in rural Deschutes County? The county lists land use approval (if your zone requires it), an approved septic system or approval to install one, driveway access, and an Oregon ePermitting account. The parcel also needs to be a legal lot of record.
How long does a building permit take in Bend? The City of Bend doesn’t guarantee review times, but it publishes a Permit Turnaround Time Dashboard with averages by permit type. Complete submittals and early site research are the most reliable ways to avoid delays.